For industrial technology and manufacturing

IMTS: 89,020 people in McCormick Place. Reps get about 9 useful hours.

Build the target list weeks ahead of the event, score for plant and automation buyers, and attribute the pipeline inside Salesforce or HubSpot.

Pre-event

IMTS: 89,020 people, 6 days, 4 buildings. About 9 useful hours per rep

  • →Build the target list weeks ahead, from the open web and the event platforms you are entitled to
  • →Enrich on your Apollo or ZoomInfo plan. Score for plant role, line ownership and equipment-buying signal
  • →Book the meetings before anyone walks a floor that size
  • →Sequence ranked lists through Apollo, Salesloft, Amplemarket, Lemlist, HubSpot, or Salesforce
From the Luminik event catalog
IMTS attendees
89,020
Dates on file
14-19 Sep 2026
Manufacturing events in our catalog
3,100+
On-floor

A manufacturing floor is no place to run capture off a laptop

  • →Badge scans, business cards and spoken notes captured on a phone at the booth and tagged to the account
  • →Holds when the hall Wi-Fi drops, then syncs to Salesforce or HubSpot when the connection comes back
  • →Without that, a machine-tool conversation stays in a rep's notebook and never reaches the CRM
  • →Owner and next step attached to the account before the team flies home
From the Luminik event catalog
Automate, Las Vegas
speakers listed
24
Automate sponsors listed
9
Hannover Messe speakers listed
20
Post-event

Trade show budgets are the first thing an industrial CFO questions

  • →Sourced and influenced pipeline attributed to each event inside your Salesforce or HubSpot
  • →Compare IMTS against Hannover Messe against the regional event on pipeline
  • →Closed-won revenue traced back to the event and the rep that sourced it
  • →Next year's booth spend defended with pipeline numbers the finance team already reads
From the Luminik event catalog
AMB Stuttgart
attendees
86,000
MSV Brno
attendees
82,230
Formnext Frankfurt
attendees
38,282

Figures above are catalog facts for the most recent edition on file rather than customer results.

89,020 people at IMTS. Your ICP is a narrow slice of the plant roles in it.

Only the first count is a catalog fact. The rest is a worked example of how the funnel narrows.

IMTS, ChicagoWorked example

Source attendees

Exhibitor directory, conference agenda and attending-company lists sourced weeks ahead of McCormick Place

Count from our catalog
89,020
Marcus Feld
Plant Director, Halden Precision Works
Yuki Sato
Head of Industrial Automation, Kestrel Forge Group
Dana Whitlock
Director Manufacturing Engineering, Sonderfeld Antriebe

Worked example. The attendee total is from the Luminik event catalog. Every figure after it is illustrative, and the sample records are invented. We have not yet published a customer program in this industry.

Proof, and where it comes from

Where our proof comes from

We have not yet published a program in industrial technology and manufacturing. The mechanism is the same one that ran the 2 programs below. Everything in this page's demos is a worked example. The numbers here come from real customers.

Customer programs, named by stage and category, with company names withheld.

Major events

Industrial and manufacturing events we map into pipeline

12 major events across North America, Europe and APAC. Every linked row opens the catalog page for that edition.

Runs in even years. Largest manufacturing floor in North America
Location
Chicago, North America
Size
89,020Catalog
When
September
Location
Las Vegas, North America
Size
31,000Catalog
When
October
24 speakers and 9 sponsors on the catalog page
Location
Las Vegas, North America
Size
~40,000Public estimate
When
May
Controls and PLC buyers in one room
Location
Boston, North America
Size
14,549Catalog
When
November
20 speakers on the catalog page
Location
Hannover, Europe
Size
~130,000Public estimate
When
April
AMB International Exhibition for Metalworking
Location
Stuttgart, Europe
Size
86,000Catalog
When
September
Central-European industrial buyers
Location
Brno, Europe
Size
82,230Catalog
When
October
Additive manufacturing and tooling
Location
Frankfurt, Europe
Size
38,282Catalog
When
November
9 speakers and 21 sponsors on the catalog page
Location
Madrid, Europe
Size
13,000Catalog
When
November
Location
Bengaluru, APAC
Size
96,000Catalog
When
January
The APAC Industry 4.0 room
Location
Seoul, APAC
Size
80,019Catalog
When
March
Best APAC fit for software vendors specifically
Location
Singapore, APAC
Size
16,000Catalog
When
October

What the Source badge means: catalog figures are the most recent edition on file, and public estimates are the organizer's published figure.

Looking for a specific event? Browse every manufacturing event in the catalog for dates, venues, speakers, and sponsors on every edition we carry.

How the first one runs

How we would run your first event

No published program in this industry yet, so here is the method.

  1. Step 1

    Source the attending-company picture

    Weeks ahead of the event we build the list from the open web and from the event platforms you are entitled to, then map it to the manufacturers, integrators and suppliers you sell to.

  2. Step 2

    Enrich and score on your plan

    Enrichment runs through your Apollo or ZoomInfo contract. Scoring is tuned to plant leadership, controls and automation engineering, manufacturing engineering, quality and direct-materials procurement.

  3. Step 3

    Sequence, then capture the booth

    Ranked lists go into your sequencer with hall-specific and booth-specific angles. On the floor, scans, cards and voice notes are captured on a phone and attached to the account.

  4. Step 4

    Attribute inside the CRM finance already reads

    Sourced and influenced pipeline is written back to Salesforce or HubSpot against the event that produced it, so a capex-length sales cycle still has the event attached when it closes.

Have an industrial event on the calendar?

20 minutes on IMTS, Hannover Messe, Automate, or Formnext. We walk sourcing, enrichment, booth capture, and writeback live on the event you already paid for.

Prasad Subrahmanya
I take every walkthrough myself. Bring the next event on your calendar.
Prasad Subrahmanya, founder
3,100+ manufacturing events in the Luminik catalogEnrichment runs on your vendor plan